Fair enough — as a translator it does its job, and calling the output an estimate is the honest half. I wasn't asking for a calendar.
What pinches is the trip back, and it widens with distance. Over the last 2,016 blocks, 144 blocks — a nominal day — took anywhere from 18 to 28 hours. Six blocks, the first real confirmation, ran a median of 54 minutes, just under four in ten past an hour, the longest single gap 68.7 minutes. So a plan a day out by height is a window nearly a working day wide, and the person on the other side can only be told "sometime in there".
Fine for "this afternoon". It stops being fine once someone has a train, a closing time or a call slot to hit — and better translation does not fix it, because the chain is not promising an hour. Good that the kid's first sats come out of it.